# Solar Interconnection Queue Dataset: Queued Up 2026 > Analyse solar-bearing transmission interconnection queue projects from Queued Up 2026, with project statuses, source attribution and explicit coverage. ## Product - [Product page](https://zentrafoundry.com/product/solar-interconnection-queue-dataset-queued-up-2026/) - [Catalogue guide](https://zentrafoundry.com/llms.txt) ## Description Explore solar-bearing project records from the specified Queued Up edition by Lawrence Berkeley National Laboratory and GridTracker. The dataset is intended for analysis of the documented transmission-generation queue coverage, preserving the source context and project-status distinctions. What this download contains The named edition covers requests through the end of 2025. Active, withdrawn, suspended and operational statuses should not be combined into a single pipeline of projects expected to be built. Rooftop, distribution, load and behind-the-meter connections are outside the stated scope. Working with this edition Inspect the schema and status fields before grouping projects, retain the required attribution and keep the source edition attached to any results. A later check of the download does not convert this annual reference into a live interconnection feed. Product questions Does a queue entry mean a project will be constructed? No. Queue records include different statuses and do not guarantee completion or additional operating capacity. Does this include rooftop solar connections? No. The stated scope is transmission-generation interconnection queues, not rooftop or distribution-level installations. ## Dataset edition - Edition: zf-063-2026-09-05-5126f43694cf - Files: data/full.jsonl; data/full.csv; data/sample.json; schema.json; provenance.json; manifest.json; quality-report.json; LICENSE.md; README.md; CHANGELOG.md; sources/original-2026-workbook.xlsx; sources/data-codebook.json; checksums.json - Formats: CSV; JSON; JSONL; MD; XLSX - Archive size in bytes: 15703456 - Row counts by table: all_records: 18108 - Row units by table: all_records: solar-bearing project rows - Coverage: All solar-bearing interconnection-queue project rows in Berkeley Lab and GridTracker’s 2026 Queued Up edition, covering requests through the end of 2025. Includes active, withdrawn, suspended and operational statuses. - Geographic scope: All solar-bearing interconnection-queue project rows in Berkeley Lab and GridTracker’s 2026 Queued Up edition, covering requests through the end of 2025. Includes active, withdrawn, suspended and operational statuses. - Publisher: Lawrence Berkeley National Laboratory and GridTracker - Publisher/source update: Explicitly unknown; see immutable provenance for the recorded source retrieval. - Source retrieved/checked for this edition: 2026-09-05T12:22:25.106551+00:00 - Edition published: 2026-09-05T12:22:25.106551+00:00 - Schema version: https://json-schema.org/draft/2020-12/schema - Licence and attribution: Source records remain subject to the original publisher terms linked in provenance.json. Retain attribution and source notices. Zentra grants use of the normalization, schema and packaging for internal and commercial analysis; this does not grant exclusive rights over public source facts or third-party material. No endorsement by source publishers. - [Publisher source](https://eta-publications.lbl.gov/sites/default/files/2026-05/lbnl_ix_queue_data_file_thru2025.xlsx) ## Schema - IA_phase_clean (string|null): - IA_phase_raw (string|null|integer): - cluster (null|integer|string): - county (string|null): - developer (null|string): - entity (string): - fips_code (integer|null): - ia_date (null|string): - mw_1 (integer|number): - mw_2 (null|integer|number): - mw_3 (null|integer|number): - on_date (null|string): - poi_name (string|null|number|integer): - project_name (null|string): - project_type (string|null): - prop_date (null|string): - prop_year (null|integer): - q_date (string|null): - q_id (string|integer|number): - q_status (string): - q_year (integer|null): - region (string): - service (string|null): - source_url (string): - state (string|null): - type_1 (string): - type_2 (null|string): - type_3 (null|string): - type_clean (string): - utility (string|null): - wd_date (null|string): ## Public preview - [Bounded dataset sample](https://zentrafoundry-public-media.fsn1.your-objectstorage.com/media/samples/zf-063-2026-09-05-5126f43694cf.json) ## Purchase and delivery - Price: EUR 49 - Price and tax basis: Owner-inventory EUR list price migrated to WooCommerce; checkout tax treatment follows the live WooCommerce configuration. Your purchase includes the edition described on this page. Later releases are separate unless this offer explicitly includes an update entitlement. ## Maintenance Source checks and new-release publication do not change the historical coverage or automatically add future editions to an earlier purchase. Scheduled checks reconcile approved publisher editions. A check date does not change the dataset coverage or imply new records. Fixed historical and synthetic editions retain their documented scope. Purchased archives are delivered through [My Library](https://zentrafoundry.com/my-account/). Public samples do not grant access to the full paid dataset. Publisher edition index last reconciled: 2026-10-02 08:44:29 UTC. This is not a source-data update date.