My LibraryCart

Energy Mobility

Solar Interconnection Queue Dataset: Queued Up 2026

49,00 

Analyse solar-bearing transmission interconnection queue projects from Queued Up 2026, with project statuses, source attribution and explicit coverage.

Purchase terms

Your purchase includes the edition described on this page. Later releases are separate unless this offer explicitly includes an update entitlement.

Source checks and new-release publication do not change the historical coverage or automatically add future editions to an earlier purchase.

Edition details

Edition
zf-063-2026-09-05-5126f43694cf
Files
data/full.jsonl, data/full.csv, data/sample.json, schema.json, provenance.json, manifest.json, quality-report.json, LICENSE.md, README.md, CHANGELOG.md, sources/original-2026-workbook.xlsx, sources/data-codebook.json, checksums.json
Formats
CSV, JSON, JSONL, MD, XLSX
Coverage
All solar-bearing interconnection-queue project rows in Berkeley Lab and GridTracker’s 2026 Queued Up edition, covering requests through the end of 2025. Includes active, withdrawn, suspended and operational statuses.
Geographic scope
All solar-bearing interconnection-queue project rows in Berkeley Lab and GridTracker’s 2026 Queued Up edition, covering requests through the end of 2025. Includes active, withdrawn, suspended and operational statuses.
Publisher
Lawrence Berkeley National Laboratory and GridTracker
Source updated
Explicitly unknown; see immutable provenance for the recorded source retrieval.
Source checked
2026-09-05T12:22:25.106551+00:00
Released
2026-09-05T12:22:25.106551+00:00
Licence and attribution
Source records remain subject to the original publisher terms linked in provenance.json. Retain attribution and source notices. Zentra grants use of the normalization, schema and packaging for internal and commercial analysis; this does not grant exclusive rights over public source facts or third-party material. No endorsement by source publishers.

View the publisher source

Schema

FieldTypeDescription
IA_phase_cleanstring|null
IA_phase_rawstring|null|integer
clusternull|integer|string
countystring|null
developernull|string
entitystring
fips_codeinteger|null
ia_datenull|string
mw_1integer|number
mw_2null|integer|number
mw_3null|integer|number
on_datenull|string
poi_namestring|null|number|integer
project_namenull|string
project_typestring|null
prop_datenull|string
prop_yearnull|integer
q_datestring|null
q_idstring|integer|number
q_statusstring
q_yearinteger|null
regionstring
servicestring|null
source_urlstring
statestring|null
type_1string
type_2null|string
type_3null|string
type_cleanstring
utilitystring|null
wd_datenull|string

Sample preview

IA_phase_cleanIA_phase_rawclustercountydeveloperentityfips_codeia_datemw_1mw_2mw_3on_datepoi_nameproject_nameproject_typeprop_date
WithdrawnWithdrawnCoconinoAPS400520Twin Arrows 69kV SubstationGeneration
WithdrawnWithdrawnYumaAPS4027900Existing PV-Dev LineGeneration2012-01-01T00:00:00
WithdrawnWithdrawnMaricopaAPS4013300Hassayampa- HooDoo Wash 500 kV LineGeneration2014-05-01T00:00:00
WithdrawnWithdrawnMaricopaAPS401320Arlington - Wintersburg 69 kV LineGeneration2012-10-31T00:00:00
WithdrawnWithdrawnMaricopaAPS401320Arlington - Wintersburg 69 kV LineGeneration2012-10-31T00:00:00
WithdrawnWithdrawnMaricopaAPS401320Cotton Center - Gillespie 69 kV LineGeneration2012-10-31T00:00:00
WithdrawnWithdrawnMaricopaAPS40132069 kV Interconnection - Gillespie Sub AreaGeneration2012-01-02T00:00:00
WithdrawnWithdrawnMaricopaAPS40132069 kV Interconnection - Tonopah areaGeneration2011-11-30T00:00:00
Category:

Explore solar-bearing project records from the specified Queued Up edition by Lawrence Berkeley National Laboratory and GridTracker. The dataset is intended for analysis of the documented transmission-generation queue coverage, preserving the source context and project-status distinctions.

What this download contains

The named edition covers requests through the end of 2025. Active, withdrawn, suspended and operational statuses should not be combined into a single pipeline of projects expected to be built. Rooftop, distribution, load and behind-the-meter connections are outside the stated scope.

Working with this edition

Inspect the schema and status fields before grouping projects, retain the required attribution and keep the source edition attached to any results. A later check of the download does not convert this annual reference into a live interconnection feed.

Product questions

Does a queue entry mean a project will be constructed?

No. Queue records include different statuses and do not guarantee completion or additional operating capacity.

Does this include rooftop solar connections?

No. The stated scope is transmission-generation interconnection queues, not rooftop or distribution-level installations.

Reviews

There are no reviews yet.

Be the first to review “Solar Interconnection Queue Dataset: Queued Up 2026”

Your email address will not be published. Required fields are marked *